Christmas Lights

A Christmas post? In March?

If the amount of wiring that has been going into the flip these past two weeks were Christmas lights, we would have one festive house!  One can only see so many pictures of wiring so I’ll save you from that however it is amazing to note the change taking shape from house to home. No light to light.

Here’s what happened in the last week and a half…

  • Sub flooring installed downstairs
  • The upstairs bathroom layout is finalized
  • Lots of meetings with contractors to bid for plumbing, drywall and installing the ductwork for heating and cooling
  • Sliding door for kitchen arrives next week & a few windows that need replaced are on their way.

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *